Difference Between Job Costing And Contract Costing
The main dissimilarities or difference between job order costing and contract costing can be pointed out as follows:
1. Meaning
Job Costing: It is a costing method used to determine the cost of specific work.
Contract Costing: It is a costing method used to determine the cost of specific contract or construction work.
2. Size Of Job
Job Costing: Generally jobs are smaller in size
Contract Costing: Jobs are big and complex
3. Time/Period
Job Costing: Work can be completed in short time.
Contract Costing: It requires longer time for completion of work.
4. Cost/Expenditure
Job Costing: Less expenditure required
Contract Costing: It requires huge expenditure
5. Location/Premises
Job Costing: Job is performed inside a factory or within the premises.
6. Payment
Job Costing: Payments are made immediately after the completion of work.
Contract Costing: Payments are made in installment.
7. Transfer of Job
Job Costing: Job cannot be transferred to other parties.
Contract Costing: Some part of contract can be given to other parties or other sub-contractors.
Job Costing Vs Contract Costing (Comparison Chart)
I hope this post is helpful to understand the difference between job costing and contract costing and to make comparison between them.
Job Costing Vs Contract Costing (Comparison Chart)
Basis For Difference
|
Job Costing
|
Contract Costing
|
Introduction
|
Costing method that records the costs of certain work
|
Costing method that records the costs of specific contract
|
Job Size
|
Smaller
|
Bigger
|
Time
|
Short
|
Long
|
Cost Required
|
Less
|
More
|
Premises/Location
|
In the factory
|
Outside the factory
|
Payment
|
Full payment after the completion of job
|
In installment
|
Transfer Of Job
|
Jobs cannot be transferred
|
Can be transferred
|
I hope this post is helpful to understand the difference between job costing and contract costing and to make comparison between them.